ELECTRICAL HAZARD RISK ASSESSMENT

understand the gaps. prioritize actions. plan the next step.

MR Power Systems reviews the installation, available evidence and the way electrical work is organized.

You receive a prioritized action roadmap that helps your team decide what needs attention, what corrective work to plan and where further engineering assessment is needed.

What we review

One view across six control areas

d7af17c8 group 158 1
number 1 small

Installation condition

Observable condition of the installation and equipment within the agreed scope, including issues that may require further investigation.

number 2 small

Documentation

Available drawings, equipment information, inspection and maintenance records, and their consistency with observed site conditions.

number 3 small

Work practices

How electrical tasks, access, permits and task authorization are organized.

number 4 small

PPE and tools

Available protective equipment, tools and relevant supporting records.

number 5 small

Training evidence

Records supporting electrical safety training, competence and task authorization.

number 6 small

Safety program controls

Procedures, responsibilities and arrangements supporting the management of electrical safety.

CLIENT-FRIENDLY OUTPUt

See the priorities. Plan the next action.

Findings, evidence and reccommended ations, organized so your team can decide what to adress first.

PRIORITY MATRIX
Illustrative example
LIKELIHOOD HighLow
F03
F02
F01
Low High
CONSEQUENCE
F01–F03: example findings
LOWMonitor
MODERATEPlan corrective work
HIGHReview controls promptly
CRITICALImmediate decision required
Illustrative layout. Priorities depend on the assessment.

How the review works

Evidence is mapped to accountable actions

  1. Define the scope

    We agree the review objectives, site areas, relevant tasks and available information.

    Outcome

    Agreed scope and initial evidence request.

  2. Plan the visit

    We review records, identify information gaps and agree site access, key contacts and operating constraints.

    Outcome

    Visit plan and information-gap list.

  3. Review the site

    We compare available documentation with observable site conditions and record findings and supporting evidence.

    Outcome

    Documented findings and evidence.

  4. Set priorities

    We group findings by urgency and action route, and identify where further calculations, testing or design work are needed.

    Outcome

    Prioritized action roadmap.

  5. Agree next steps

    We explain the findings, discuss the roadmap and agree how to organize the next steps.

    Outcome

    Agreed next steps for your team.

OUR APPROACH

A clear action roadmap for your site

Understand what needs attention, why it matters and what to do next. Findings are organized into four action categories, helping your team set priorities, assign responsibilities and plan follow-up work.

Address findings that need prompt attention

Recommended interim measures for findings that may require action before longer-term corrective work is completed.

What you receive

  • The relevant findings and supporting evidence.
  • Recommended interim actions and the reasoning behind their priority.
  • A clear indication of decisions required from your site team.
Illustrative exampleAn access-control concern is recorded with its supporting evidence and a proposed interim response for the site team to assess.

How your team uses it Decide which interim measures to adopt, assign responsibility and organize follow-up work.

Turn identified gaps into planned corrective work

Installation, equipment, maintenance and documentation findings are organized into clear items for follow-up.

What you receive

  • Documented issues within the agreed review scope.
  • Recommended corrective actions and their priorities.
  • Identification of items requiring further verification.

Illustrative example

A drawing differs from an observed site condition. The roadmap records the discrepancy and identifies the verification or documentation work needed.

How your team uses it
Plan maintenance and documentation work, assign owners and coordinate completion with site operations.

Strengthen work procedures and competence evidence

Findings highlight gaps in how electrical tasks are organized, authorized and supported by procedures and training records.

What you receive

  • Identified gaps in procedures, authorization or training evidence.
  • Recommended areas for review or improvement.
  • Links between the findings and the relevant site activities.
Illustrative exampleAvailable records do not clearly establish task authorization. The roadmap identifies the evidence gap and the review needed.

How your team uses it
Plan procedure updates, review authorization arrangements and identify training needs.

Define where further engineering is needed

Some findings require calculations, testing or design work
beyond the agreed review scope. These are identified
as separate next steps.

What you receive

  • The technical questions requiring further assessment.
  • The type of study, testing or design work to consider.
  • Identification of information needed to define the next scope.

Illustrative example

A finding raises a question requiring short-circuit
or arc-flash calculations. The roadmap identifies
the need for a separately scoped study.

How your team uses it
Define the next engineering task, gather the required inputs
and request an appropriate scope and quotation.

LV/MV Substation Safety Audit

A focused review of substation condition and readiness

The audit does not replace intrusive maintenance testing or calculation-based equipment verification unless those activities are explicitly included.

LV and MV substations

The scope can be expanded to review:

  • Safe access, room condition and emergency arrangements
  • Visible switchgear and installation condition
  • Required technical and safety documentation
  • PPE and substation safety equipment
  • Maintenance and inspection evidence
  • Local procedures, authorization and electrical safety-plan controls
  • Potential need for AFRA, short-circuit, protection or design work

FAQ

Start with EHRA when the main question is broad: the site does not know the condition of its documentation, work controls, maintenance evidence or overall electrical safety gaps. Start with AFRA when the primary decision requires calculation of incident energy and arc-flash boundaries. The two services can be combined where appropriate.

Useful inputs include single-line diagrams, equipment lists, maintenance and inspection records, protection information, permits, LOTO procedures, authorization lists, training records, PPE rules, previous audit findings and planned modifications. Missing documents are themselves relevant evidence and do not prevent the initial review.

Yes, within the agreed site-review scope. We compare relevant documents with observable conditions and identify discrepancies. Intrusive checks, measurements or full as-built documentation require a separately defined scope.

Only where required, justified and safe. The need depends on the available documentation, the question being assessed and site access rules. Any opening of energized equipment or outage requirement is planned with the client in advance.

Many review activities can be performed while production continues. If safe access or verification requires an outage, we define the smallest affected area and agree the timing before work begins.

Usually a facility, maintenance or engineering representative with safe access to the relevant rooms and knowledge of recent changes. HSE or operations representatives may join parts of the review depending on the scope.

Not automatically. EHRA identifies where detailed calculations are required. AFRA and power system studies are included only when explicitly listed in the quotation.


Not automatically. The audit can review available testing evidence and identify the need for maintenance or protection testing. Field testing and commissioning require an explicit scope, method and responsibility matrix.

Yes, as a separately agreed service. The documents must be tailored to the client’s organization, equipment, local requirements and authorization structure.

Yes. Where suitable project results are available, training can explain how labels, boundaries, PPE information and work controls apply in the client’s environment. Final task authorization remains the employer’s responsibility.

We can work under an NDA and agree site-access, photography, storage and document-transfer rules before the visit.

The client assigns owners, approves actions and tracks closure. MRPS can support selected engineering, documentation, training or follow-up activities under an agreed scope.